Hello Team,
I was trying to connect SAP ECC/BW system but it was showing below error -
Caused by: com.sap.conn.jco.JCoException: (102) JCO_ERROR_COMMUNICATION: Initialization of repository destination SAP [source] failed: Establishing connection to communication partner failed at CPIC-CALL: CMRCV on convId: 35200000\n\tconnection parameters: TYPE=A DESTINATION=: Server is DOWN or Connection parameters are incorrect
I have followed the troubleshooting steps mentioned on option 1 in below guide -
https://documentation.sailpoint.com/connectors/sap/hr_hcm/help/integrating_sap_hr_hcm/troubleshooting.html
but still facing the same issue. Does anyone have any thoughts over the SAP test connection issue?
Thanks!!
I appreciate the help !!