Joiner Error: Workflow transition failing in Joiner

Which IIQ version are you inquiring about?

8.4.

Please share any images or screenshots, if relevant.

Please share any other relevant files that may be required (for example, logs).

Lifecycle Event - joiner Test.xml (14.6 KB)

Share all details about your problem, including any error messages you may have received.

Joiner transition in SailPoint is failing, and as a newcomer to this tool, I’m struggling to identify the issue. I updated the plan and attempted to pass it to the next step, but I keep encountering the error: ‘Missing Variable: Plan Step: Initialize.’ Could you guide me on what might be causing this and how to resolve it?

Hi,

In “Build Plan” step, initialize plan outside of try block or keep below two lines inside try block.

This topic was automatically closed 60 days after the last reply. New replies are no longer allowed.